Petroleum and Mining Engineering Pty Ltd (PAME) completed 63.9km Sole Development Pipeline Project to support Subsea 7 Australia Reel-Lay installation, offshore Victoria Australia.
PAME’s scope of work encompassed project management and engineering associated with the establishment of a self-sufficient Mobile Spoolbase at the Crib Point Terminal (Western Port Bay, Victoria) complete with a 1500m pipe stalk laydown area. PAME took receipt of approx. 5350 lengths of 12.2m (12”) linepipe prior to welding, AUT inspection and IntelliCOAT ® Field Joint Coating (FJC) within a dedicated 200m Firing-Line. Forty Three (x43) 1500m rigid pipe stalks were fabricated and tested by PAME, prior to manipulating stalks via in-water roller boxes to the stern mooring position of a dedicated Reel-Lay Vessel. PAME also completed the onshore and offshore tie-in welding, testing and FJC. The Sole gas field is located in the eastern part of the Gippsland Basin, approximately 40km offshore Victoria. The Sole Development Project undertaken by Cooper Energy (Sole) Pty Ltd consists of the subsea tie-back of two wells to the Orbost Gas Plant |
|
|
Crib Point Community EngagementThroughout the fabrication phase of the project, Petroleum & Mining Engineering’s workforce led the charge to raise funds for the local community. The Workforce along with Petroleum & Mining Engineering (PAME), Subsea 7 and Cooper Energy raised a total of $18,000.
Pictured presenting the donations are two representatives from PAME’s HSR (Health & Safety Rep’s) Team; Shaun Duncan & Simon Proud, along with a group photo of the workforce and community members on the day of the presentations (23rd Oct 2018). The beneficiaries of said funds were;
PAME also received a special thank you poster for the donations to the community (pictured). |