VIC/P44 development is located between Pecten East and the existing Casino infrastructure incorporating two new wells (Henry-2 and Netherby). The 24km pipeline consists of 12” (323mm) OD x 18.1mm WT, DNV SML 450 pipe with FPD (3LPP).
PAME established a Mobile Spoolbase at the Crib Point Terminal (Victoria) and undertook fabrication, testing and field joint coating (FJC) of 20 x 1.15km pipe stalks.

PAME manipulated the stalks to the stern mooring position for spooling onto the Subsea7 Reel-lay vessel “Seven Navica”.  PAME also completed the offshore tie-in welds and FJC.